Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Chan, A P C, Wong, F K W, Chan, D W M, Yam, M C H, Kwok, A W K, Lam, E W M and Cheung, E (2008) Work at Height Fatalities in the Repair, Maintenance, Alteration, and Addition Works. Journal of Construction Engineering and Management, 134(07), 527–35.

Damnjanovic, I and Zhang, Z (2008) Risk-Based Model for Valuation of Performance-Specified Pavement Maintenance Contracts. Journal of Construction Engineering and Management, 134(07), 492–500.

  • Type: Journal Article
  • Keywords: Pavement management; Highway maintenance; Risk management; Contracts; Performance characteristics; Rehabilitation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(492)
  • Abstract:
    Many transportation agencies have started outsourcing maintenance activities to contractors by means of performance-based contracts. These outsourcing contracts are intended to transfer performance-based risk from transportation agencies to private contractors for a premium cost. Even though such contracts provide numerous benefits to both contractual parties, there are equally many concerns with their implementation. Certainly, one of the most important concerns is how to quantify performance-based risk. This paper presents a general and flexible framework for quantifying the performance-based risk in terms of premium cost for different contract specifications and preventive maintenance and rehabilitation strategies. The framework developed consists of three modular components: (1) the reliability-based pavement performance model; (2) the preventive maintenance and rehabilitation models; and (3) the pricing model. The developed framework is illustrated using the current design and rehabilitation methods for flexible pavements.

Eastman, C M and Sacks, R (2008) Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities. Journal of Construction Engineering and Management, 134(07), 517–26.

Goedert, J D and Meadati, P (2008) Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management, 134(07), 509–16.

Hyun, C, Cho, K, Koo, K, Hong, T and Moon, H (2008) Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. Journal of Construction Engineering and Management, 134(07), 468–82.

Nguyen, L D and Ibbs, W (2008) FLORA: New Forensic Schedule Analysis Technique. Journal of Construction Engineering and Management, 134(07), 483–91.

Salem, O and Mohanty, S (2008) Project Management Practices and Information Technology Research. Journal of Construction Engineering and Management, 134(07), 501–8.

Sanad, H M, Ammar, M A and Ibrahim, M E (2008) Optimal Construction Site Layout Considering Safety and Environmental Aspects. Journal of Construction Engineering and Management, 134(07), 536–44.

Tam, V W Y, Le, K N and Le, H N (2008) Using Gaussian and Hyperbolic Distributions for Quality Improvement in Construction: Case Study Approach. Journal of Construction Engineering and Management, 134(07), 555–61.

Tang, W, Qiang, M, Duffield, C F, Young, D M and Lu, Y (2008) Incentives in the Chinese Construction Industry. Journal of Construction Engineering and Management, 134(07), 457–67.

Zhang, H, Li, H and Lu, M (2008) Modeling Time-Constraints in Construction Operations through Simulation. Journal of Construction Engineering and Management, 134(07), 545–54.